Tesla Megapack Industrial Energy Storage
Utility-scale battery storage for Florida commercial properties, data centers and grid-support projects, delivered by a Tesla Certified installer.
Tesla Energy
Certified Installer
FL Licensed
Solar + Roofing + Electrical
Veteran Owned
Florida business
Straight answer
What Is Tesla Megapack and Who Needs One in Florida?
Megapack is a fully assembled utility-scale battery system used for commercial energy storage, demand charge reduction, backup power and grid support. It suits data centers, large commercial properties, utilities and developers needing multi-megawatt to multi-gigawatt-hour capacity.
- Deployed capacity
- 7+ GWh globally
- Tesla-reported operational Megapack fleet
- Warranty
- 20 years
- Performance guarantee included
- Install time savings
- ~25%
- Prefabricated foundation and integrated wireways
- Uptime
- 99%+ average
- Across operating Megapack deployments
Pricing shown is typical and a starting point. Your exact quote is confirmed after a site survey and depends on roof condition, electrical service, equipment choices and local permitting.
Get an accurate quoteOverview
Utility-Scale Storage for Commercial and Industrial Florida Sites
Megapack is Tesla's largest battery product: a fully integrated, pre-assembled storage unit designed to be craned into place with its foundation and wireways already built in. Each unit is scoped in megawatt-hours rather than kilowatt-hours, which puts it in a different category from the Powerwalls we install on homes.
In Florida, the use cases we see most are data centers and colocation facilities that need firm backup power and peak shaving, commercial and industrial customers facing steep demand charges from FPL, Duke or TECO, and developers building solar-plus-storage projects that need to shift generation into evening peak hours.
Use cases
Where Megapack Fits on a Florida Commercial Project
Data Centers
Firm, dispatchable backup and load-shifting capacity to support high-density compute loads without oversizing generators.
Demand Charge Reduction
Discharging during utility peak windows can meaningfully cut the demand charge portion of a commercial FPL, Duke or TECO bill.
Solar-Plus-Storage
Pairing Megapack with a commercial solar array, typically $2.20 to $2.60 per watt installed, lets a site store midday production and use it during the evening peak instead of exporting it. Megapack pricing itself is quoted per project based on load data and interconnection scope.
Grid Support and Resilience
Utilities and large campuses use Megapack fleets to stabilize local grid segments and provide backup during storm-driven outages.
Specs
Megapack Platform Specifications
Figures reflect Tesla's published Megapack platform data.
- Manufacturing capacity
- 80 GWh/yr
- Combined Lathrop, CA and Shanghai megafactories
- CO2e avoided
- 88,000 tons
- Per Megapack 2 XL unit, per Tesla data
- Safety compliance
- 40+ standards
- Global fire and safety certifications
- Service options
- Tesla or certified team
- Tesla-run service or in-house team certified by Tesla
Process
How a Coastal Energy Megapack Project Moves Forward
01
Load and Site Assessment
We review your utility bills, interval data and site layout to size storage against your actual demand profile.
02
Engineering and Interconnection
Stamped electrical drawings and an interconnection application go to your utility, since Megapack projects require utility coordination beyond standard net metering.
03
Permitting
Commercial battery installations require fire code review and local building department approval, which varies by Florida county for large stationary storage.
04
Delivery and Crane Placement
Megapack units arrive pre-assembled and are set on a prepared pad, cutting the field labor needed compared to site-built battery rooms.
05
Commissioning and Service Setup
We commission the system with Tesla and set up either Tesla-managed service or a certified in-house maintenance plan.
Florida specifics
Permitting and Interconnection for Large Battery Storage in Florida
Megapack scale projects are reviewed differently than residential solar. Local fire marshals and building departments in Lee, Collier and Miami-Dade counties require setback, ventilation and thermal runaway documentation specific to large lithium-ion installations, and the utility interconnection process for a multi-megawatt system runs through a commercial application, not the standard residential net metering form.
We scope these projects with your utility account manager early so the interconnection study timeline is known before construction starts, since that step often drives the overall project schedule more than the physical installation.
Answers
Frequently Asked Questions
Do You Work as a Tesla Megapack Installer in Florida?
How is Megapack different from a Powerwall?
How long does a Megapack project take from start to operation?
Who services a Megapack system after installation?
What is Tesla Megapack used for?
What is the warranty on Tesla Megapack?
Can Megapack be paired with commercial solar?
Is Coastal Energy a Tesla Certified installer for Megapack?
Keep reading
Related Pages
Considering Megapack for a Commercial Site?
Talk to our commercial team about load data, interconnection and timeline.