Coastal Energy Florida solar, roofing and electrical contractor logo

Metal vs Tile Roof for Solar in Florida

The mounting method, the cost per square foot and the lifespan all change with the roof. Here is how the two compare under a solar array.

Eric Perez, COO - Reviewed by our Florida licensed roofing (CCC1335978) and electrical (EC13013993) team - Published - 8 min read

Tesla Energy

Certified Installer

FL Licensed

Solar + Roofing + Electrical

Veteran Owned

Florida business

Close view of a new standing seam metal roof on a Florida home

Straight answer

Is a Metal or Tile Roof Better for Solar in Florida?

Standing seam metal is the better roof under solar in Florida because panels clamp to the seams with no penetrations, and it installs at about $12 per square foot. Tile lasts longer but requires flashed penetrations and careful tile handling, which raises labor cost on both the roof and the solar install.

Metal reroof
$12 per square foot
Typical project $24,000 - $27,000
Kynar finish upcharge
$1.50 per square foot
Longer color and chalk resistance
Roof types we install
Metal and tile only
We do not install shingle roofs
New solar protection
30 years
Solar Insure parts and labor plan on eligible installations

Pricing shown is typical and a starting point. Your exact quote is confirmed after a site survey and depends on roof condition, electrical service, equipment choices and local permitting.

Get an accurate quote

Side by side

Metal Versus Tile Under a Solar Array

Both roof types are appropriate for Florida solar. The differences that matter are how panels attach, how the roof behaves during the solar install, and what the combined project costs.

FactorStanding seam metalTile
Solar attachmentSeam clamps, no roof penetrationsFlashed penetrations through the deck, tiles removed and reset
Installed roof cost$12 per square foot, $24,000 - $27,000 typicalQuoted per project, materially higher than metal
Expected service life40 to 50 years50+ years for the tile, underlayment is the limiting layer
Leak risk with solarLowest, attachment is non-penetratingManageable, depends entirely on flashing craft
Solar labor costLower, faster rackingHigher, tile handling and breakage replacement
Wind performanceExcellent when fastened to codeExcellent, individual tiles can dislodge in extreme events
Best fitReroof plus solar as one projectExisting tile in good shape, or architectural requirement

Every price comes from our current Florida price list. Items not listed are quoted per project after a site inspection.

Attachment

Why the Mounting Method Decides Most of This

On standing seam metal, solar racking clamps directly to the raised seams. Nothing is drilled through the roof surface, so the assembly that keeps water out is never interrupted. That is the single biggest reason we point homeowners toward metal when the roof is being replaced anyway: the highest risk part of a solar install simply goes away.

On tile, each mounting point means lifting tiles, attaching a base to the deck, and installing a flashing that sheds water above and below the penetration. Done properly it is a permanent, watertight detail. Done by a crew that treats tile like shingle, it is a callback. Because we hold roofing license CCC1335978 in-house, the same company that flashes the penetration owns the leak warranty on it.

Decision rules

How We Advise on the Roof Before a Solar Install

Roof Has 10 or Fewer Years Left

Replace it first. Removing and reinstalling an array later costs more than the roof savings from waiting.

Reroofing Anyway

Choose standing seam metal. Non-penetrating attachment plus a 40 to 50 year service life matches the solar warranty period.

Tile in Good Condition

Keep it. We inspect underlayment condition and flash every mount, rather than pushing an unnecessary reroof.

Currently Shingle

We do not install shingle. If you want solar over an aging shingle roof, the path is a metal or tile replacement first.

Coastal Salt Exposure

Specify a Kynar finish at $1.50 per square foot for longer color and chalk resistance near the water.

One project

Combining the Reroof and the Solar Install

When both scopes run under one contract, the array is designed against the finished roof, the permit schedule is coordinated, and the electrical rough-in happens while access is already open. That collapses two projects with two inspection cycles into one, and it removes the argument about which contractor caused a leak.

It also simplifies responsibility. Eligible new solar installations include 30 year Solar Insure parts and labor protection, while roof penetration coverage is limited to resealing and reflashing within 3 inches of covered mounting points. Roofing material coverage remains separate.

Answers

Frequently Asked Questions

How much does a metal roof cost in Florida?

Standing seam metal runs $12 per square foot installed, with a typical project landing between $24,000 and $27,000 depending on size and complexity. A Kynar finish adds $1.50 per square foot.

Can solar panels be installed on a tile roof?

Yes. Tiles are lifted, mounts are attached to the deck, and each penetration gets a flashing that sheds water. It costs more in labor than metal and depends heavily on flashing craft, which is why we keep roofing in-house.

Do you install shingle roofs?

No. We install metal and tile roofs only. If you have an aging shingle roof and want solar, the path is a metal or tile replacement.

Is a metal roof better in a hurricane?

Both perform well when fastened to current Florida code. Standing seam metal is a continuous fastened assembly, while individual tiles can dislodge in extreme events. County wind speed requirements in our service areas run from 140 to 180 mph.

Do solar panels damage a metal roof?

No. On standing seam metal, racking clamps to the seams without drilling through the roof surface, so the water barrier stays intact. That is the lowest leak risk mounting method we install.

Should I replace my roof before installing solar?

If the roof has roughly ten years or less of service life left, replace it first. Removing and reinstalling an array to reroof underneath it costs more than any savings from delaying.

Which roof lasts longer, metal or tile?

Tile itself can exceed 50 years and standing seam metal runs 40 to 50 years. On tile the underlayment is the limiting layer, which is why an older tile roof can need work even when the tiles look fine.

Does one company handle both the roof and the solar?

Yes. We hold Florida roofing license CCC1335978 and electrical license EC13013993, so the reroof, the mounting and the electrical run under one contract with one workmanship warranty.

Keep reading

Related Pages

Get a Roof and Solar Number Together

Send your address and we will price the reroof and the solar array as one project.